dear all,
I have a scada system (step,wincc v7.x) consisting of :
-1 Engineer station
-two operator station
-1 server station
I have the following questions:
-Is there a way to switch from the scada system to a DCS solution (PCS7 v7/v8.x) without redeveloping the whole solution?
-If so what would be the licences to add/update?
-A redundancy operation of this server is also required, what would be the licenses and procedure to follow for this without stopping the master server?